Remarks: Supply of complete DCS ESD system Engineering FAT installation System power SAT and commissioning of DCS and ESD
Pakarab Fertilizer(ESD/ System Integration Project)
System Installed: Fertilizer Plant
Installation Year: 2009
System Size: l/Os approx 550
Operator Stations: 8
Remarks: Supply of complete DCS ESD system Engineering FAT installation System power SAT and commissioning of DCS and ESD and ESD
Pak Arab Fertilizer Limited
Plant: Fertilizer Plant
Services: Supply, Engineering, Installation of cable trays, conduit, cable laying, cable termination, field instruments etc.
Year: 2006
Oil Refinery
Plant: Oil Refinery
Services: Supply & Annual services of System.
Year: 2006
Fatima Fertilizer
Fatima Fertilizer
System Installed: Centum CS3000R3
Installation Year: 2009
System Size: l/Os approx 7500
Remarks: Supply of complete DCS ESD system Engineering FAT installation System power SAT and commissioning of DCS and ESD
Fatima Fertilizer (ESD/ System Integration Project)
System Installed: Fertilizer Plant
Installation Year: 2009
System Size: l/Os approx 3500
Remarks: Supply of complete DCS ESD system Engineering FAT installation System power SAT and commissioning of DCS and ESD
Al-Noor Sugar Mills Limited
Shahmurad Sugar Mills Limited System Expansion
System Installed: Centum CS3000R3
Installation Year: 2008
System Size: l/Os approx 160
Operator Stations: 2
Remarks: Supply Installation Engineering and commissioning of CS3000 R3 DCS
Al-Noor Sugar Mills Limited
System Installed: Centum CS3000R3
Installation Year: 2006
System Size: ll/Os approx 208
Operator Stations: 2
Remarks: Supply Installation Engineering and commissioning of CS300 R3 DCS
Shahmurad Distillery
System Installed: Centum CS3000R3
Installation Year: 2004
System Size: I/Os approx 500
Operator Stations: 3
Remarks: Engineering, installation and commissioning done by UEC.
Ehanol/Distillery
Plant: Ehanol/Distillery
Services: Engineering, fabrication & installation of equipment, piping and other ancillary items.
Year: 2007
Ehanol/Distillery
Plant: Ethanol/Distillery
Services: Complete installation & commissioning of LV/MV cables, switch gear etc.
Year: 1994
Pakistan Refinery Limited
Pakistan Refinery Limited
System Installed: Centum CS3000R3
Installation Year: 2008
System Size: l/Os approx 128
Operator Stations: 2
Remarks: Supply Installation Engineering and commissioning of CS3000 R3 DCS
Descon Oxychem Limited
Descon Oxychem Limited
System Installed: Centum CS3000R3
Installation Year: 2008
System Size: l/Os approx 128
Operator Stations: 2
Remarks: Supply Installation Engineering and commissioning of CS3000 R3 DCS
Fertil Urea Plant UAE
Plant: Fertil Urea Plant UAE
Services: Supply of Field Instruments.
Year: 2009
Bosicor Refinery
Bosicor Refinery System Expansion
System Installed: Centum CS3000R3
Installation Year: 2006
System Size: l/Os approx 250
Operator Stations: 1
Remarks: Supply Installation Engineering and commissioning of CS3000 R3 DCS
Bosicor
System Installed: Centum CS3000R3
Installation Year: 2005
System Size: l/Os approx 250
Operator Stations: 2005
Remarks: Supply, Installation, Engineering and commissioning of DCS system
Bosicor Refinery System Expansion
System Installed: Centum CS3000R3
Installation Year: Ord-2004
System Size: I/Os approx 500
Operator Stations: One more added
Remarks: Engineering, installation and commissioning done by UEC. After the 1st phase of successful and satisfactory working of the DCS system and our services. Another expansion was awarded for the system.
Bosicor Refinery
System Installed: Centum CS3000R3
Installation Year: 2004
System Size: I/Os approx 600
Operator Stations: 2
Remarks: Engineering, installation and commissioning done by UEC.
Oil Refinery
Plant: Oil Refinery
Services: Engineering, fabrication & installation of equipment, piping and other ancillary items.
Year: 2009
OGDCL
OGDCL Dhodak
System Installed: Centum CS3000R3
Installation Year: 2005
System Size: l/Os approx
Remarks: Supply, Installation, Engineering and commissioning of DCS system
Dhodak Gas Field (OGDCL) Expansion of the system
System Installed: Centum CS3000R3
Installation Year: Ord-2004
System Size: I/Os approx 200
Remarks: Engineering, installation and commissioning done by UEC. After the 1st phase of successful and satisfactory working of the DCS system and our services. Another expansion was awarded for the system.
Dhodak Gas Field (OGDCL)
System Installed: Centum CS3000R3
Installation Year: 2003
System Size: I/Os approx 1000
Operator Stations: 2
Remarks: Engineering Installation and commissioning by UEC. This is another retrofit job. Shifting from Bailey Single loops control system to our DCS.
Nur & Bagla Gas Condensate Fileds
Plant: Nur & Bagla Gas Condensate Filed
Services: Supply, Installation & Commissioning of Gas Metering Skid
Year: 2004
Dhakni Gas Metering Skid
Plant: Dhakni Gas Metering Skid
Services: Supply, Installation & Commissioning of Gas Metering Skid
Year: 2006
Fauji Fertilizer Company, Mirpur
Fauji Fertilizer Company, Mirpur
System Installed: Centum CS3000R3
Installation Year: 2005
System Size: l/Os approx
Remarks: Supply, Installation, Engineering and commissioning of DCS system
FFC Mirpur Mathelo
System Installed: Centum CS3000
Installation Year: Ord-2004
System Size: I/Os approx 1100
Operator Stations: 4
Remarks: Just being awarded.
FFC Goth Machi
System Installed: Centum CS3000
Installation Year: 2002
System Size: I/O approx 1200
Operator Stations: 3
Remarks: Engineering Installation and commissioning by UEC. This is another success story as we shifted the control from Old Foxboro single loops system (Spec200) while plant was running. Hence there was no production loss. Hence we become pioneers here also for the HOT CHANGEOVER job in Pakistan for such a complex process. This change over was completed without single shutdown of the process.
FFC (ESD/ System Integration Project)
System Installed: Prosafe
Installation Year: 2005
Remarks: Supply, Installation, Engineering and Commissioning
FFC Mirpur Mathelo
Plant: Fertilizers
Services: Supply of Control Valves.
Year: 2007
Fertilizers
Plant: Fertilizer
Services: Supply & Supervision of Control Equipment.
Year: 2006
Priemier Chemicals
Priemier Chemicals
System Installed: Centum CS3000R3
Installation Year: 2005
System Size: l/Os approx
Remarks: Supply, Installation, Engineering and commissioning of DCS and Field Instruments
Ethanol/Distillery
Plant: Ethanol/Distillery
Services: Complete installation & commissioning of LV/MV cables, switch gear etc.
Year: 1990
Sitara Chemicals
Sitara Chemicals
System Installed: Centum CS3000R3
Installation Year: 2005
System Size: l/Os approx
Remarks: Supply, Installation & Commissioning of DCS.
Rehmat Gas Field
Rehmat Gas Field Development Project
System Installed: Centum CS3000R3
Installation Year: 2004
System Size: I/Os approx 1200
Operator Stations: 4
Remarks: Engineering, installation and commissioning by UEC. The under is Petronass Carigali. This project included ESD system RTUs and Gas Metering Skid. Every system was successfully communicated with DCS which is acting as supervisory system for all the other systems. In this project RTUs were quite away from DCS and Fiber Optic links were used for the communication between DSC and RTUs
Metol Distillery
Metol Distillery
System Installed: Centum CS3000R3
Installation Year: Ord-2004
System Size: I/Os approx 500
Operator Stations: 3
Remarks: Engineering, installation and commissioning done by UEC.
Chemi Visco Fibres
Chemi Visco Fibres
System Installed: Centum CS3000
Installation Year: 2002
System Size: I/Os approx 600
Operator Stations: 2
Remarks: Engineering Installation and commissioning by UEC. This was another mile stone as this was the ever first plant of this kind in Pakistan and UEC not only supplied all field instruments but also successfully commissioned the project. Hence become a pioneer in the Visco Fiber Plant process.
Pakistan Synthetics
Pakistan Synthetics
System Installed: Centum CS3000
Installation Year: 2001
System Size: I/Os more than 1500
Operator Stations: 3
Remarks: Engineering Installation and commissioning by UEC. This project was mile stone and UEC completed the engineering of very complex process within one and half month.
PARCO Refinery
PARCO Refinery
System Installed: Centum CS
Installation Year: 1998
System Size: I/Os more than 12000
Operator Stations: more than 40
Remarks: Supplied by Yokogawa Singapore with involvement of UEC in all the phases from Engineering, Installation, commissioning and Project Management. This is the biggest DCS system installed in any industry in Pakistan and there is no failure todate in this system
Tri Pak
Tri Pak
System Installed: Centum XL
Installation Year: 1997
System Size: 1200
Remarks: Supply, Erection & Commissioning
Lucky-Gold Star, Qaiser-Lucky Chemicals
Lucky-Gold Star, Qaiser-Lucky Chemicals
Installation Year: 1995
Remarks: Di-Octy Phthalate (DOP) Supply, Erection & Commission of Distributed Control System
Hoeshst-Ravi Chemicals Ltd.
Hoeshst-Ravi Chemicals Ltd.
Installation Year: 1995
Remarks: Di-Octyl Phthalate (DOP) Maelic Anhydride (MA) & Ptahalic Anhydride (PA) Supply, Election & Commission of Distributed Control System
Nimir Chemicals
Nimir Chemicals
System Installed: Micro Excel
Installation Year: 1995
System Size: I/Os approx 400
Operator Stations: 3
Remarks: Engineering Installation and commissioning by UEC. This system is now obslete still it is running
Rupafil
Rupafil
System Installed: Micro Excel
Installation Year: 1993
System Size: I/Os approx 350
Operator Stations: 2
Remarks: This system is still running todate
Jamshoro Power Plant
Jamshoro Power Plant
System Installed: Micro Excel
Installation Year: 1988
System Size: Micro Excel
Operator Stations: 3
Remarks: Supplied by Mitsubishi Japan still this system is running trouble free
PDIL
Triconex
System Installed: Triconex
Installation Year: 2005
Remarks: Supply, Installation, Engineering and commissioning of ESD system
MOL Oil & Gas
Plant: MOL Oil & Gas
Services: Supply of Power, Control, Instruments and Data Communication cable.
Year: 2008
Natural Gas Processing Plant
Plant: Natural Gas Processing Plant
Services: Supply & Commissioning of Gas Metering Skid.
Year: Mar-05
Engro Chemicals
Engro Chemicalss
System Installed: AAB August System
Installation Year: 1998
Remarks: ESD System Installation Commissioning
PARCO Refinery
PARCO Refinery
System Installed: PROSAFE Safety PLC
Installation Year: 1998
System Size: I/Os more than 2000
Operator Stations: more than 40
Remarks: One of the biggest ESD system in Pakistan from Yokogawa.
United Ethanol
United Ethanol
Plant: United Ethanol
Services: engineering, fabrication & installation of equipment, piping and other ancillary items.
Year: 2010
Rafhan Maiz Products
Rafhan Maiz Products
Plant: Food product
Services: Supply of Field Instruments.
Year: 2008
Fields
Plant: Field
Services: Supply, Installation & Commissioning of Field Instruments.
Year: 2003
Glucose/Food
Plant: Glucose/Food
Services: Complete installation & commissioning of LV/MV cables, switch gear etc.
Year: 1987
Crystalline Chemicals
Crystalline Chemicals
Plant: Ehanol/Distillery
Services: Engineering, fabrication & installation of equipment, piping and other ancillary items.
Year: 2007-08
Packages Limited
Bulleh Shah Paper Mills
Plant: Bulleh Shah Paper Mills
Services: Supply of Control Valves.
Year: 2007
Bulleh Shah Paper Mills
Plant: Bulleh Shah Paper Mills
Services: Supply & Supervision of Control Equipment..
Year: 2006
Deutsche Babcock UAE
EPC
Plant: EPC
Services: Supply of Power and Control Cable , Supply, Engineering, Installation of Cable trays, conduit, Cable Laying, Cable Termination of Field Instruments.
Year: 2007
Al-Moiz Industries Limited
Sugar Mills
Plant: Sugar Mills
Services: Supply & Supervision of Control Equipment.
Year: 2006
Dewan Salman Fibre
Field-CCR
Plant: Field-CCR
Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
Year: 2004
Crescent Textile
Field + CCR
Plant: Field + CCR
Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
Year: 2003
Crescent Greenwood
Field + CCR
Plant: Field + CCR
Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
Year: 2003
Sphire Fabrics
Field + CCR
Plant: Field + CCR
Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
Year: 2003
Nishat Mills Ltd.
Field + CCR
Plant: Field + CCR
Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
Year: 2003
Packages
Field
Plant: Field
Services: Supply, Installation & Commissioning of Field Instruments.
Year: 2003
United Sugar Mills Ltd.
CCR + Field
Plant: CCR + Field
Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
Year: 2003
Glaxo Pakistan
Pharmaceutical Plant
Plant: Pharmaceutical Plant
Services: Supply of Control Equipment.
Year: February, 1988
Hoeshst-Ravi Chemicals
Di-Octyl Phthalate DOP, Maelic Anhydride (MA) & Ptahalic Anhydride PA